New build

Foxham A house for eight, held to three hundred square metres

Category
New build
Built by
Clinton Topp, his own family home
Location
Churton Park, Wellington

02Churton Park

  1. Eight people, one house

    Clinton's own family home, and the brief was a number before it was a house: eight people, across two generations, all of whom had to be able to live in it at once. The target he set was about 300 m² — large, but not open-ended. Most of the design work went into holding that line, because the easy answer to a big household is simply to keep adding floor area until the problem goes away.

  2. Designed with the architect

    Clinton developed the design with input from his in-laws — the people who would be living in the downstairs half of it — and worked alongside the architect on the documentation. He managed the consenting, then coordinated the groundworks and the specialist trades through the build. Designing a house you will also build, and then live in, closes a loop most builders never get to close.

  3. Retaining, foundations, roof

    Clinton and his team built the retaining wall and the concrete foundations, then carried the main structural build through to completion. The roofing on this project is his own work as well, which is not true of every job he has run. Public property records put the finished house at 315 m² on a 721 m² section — close enough to the 300 m² target to say the line held.

  4. Two of everything, upstairs and down

    The answer to eight people was not bigger shared rooms — it was five bedrooms and four bathrooms split into two zones that can run independently. Downstairs there is a suite with its own ensuite, a bedroom beside it and a separate full bathroom. Upstairs, the master has its own ensuite and the main bathroom carries the bath. Nobody queues, and nobody has to cross the house at night.

  5. Open, or not

    The kitchen, dining and main living areas had to flow into a separate lounge without the lounge becoming a corridor off the end of them. Full-height cavity sliders do both jobs from one detail: pushed back, the connection is as wide as the wall and the spaces read as one; closed, the lounge is a genuinely separate room. It is the difference between a house that is open-plan and a house that can choose.

  6. Keeping the noise down

    A household of eight is a sound problem, and Clinton designed for it before it existed. Hebel aerated-concrete flooring went in between the upper and lower levels, with further soundproofing through the walls and around the cinema. He rates the result: the separation worked in use, not just on paper, which is the only test that counts on a house you then live in.

  7. Behind the red door

    The cinema is the part of this build Clinton is proudest of, and it was sited so that a visitor finds it from the entrance and the main living areas without being shown. Its red door matches the front door, so the transition announces itself — and opening it puts you somewhere else entirely: tiered seating, red chairs, dark curtains and carpet and ceiling, lighting run into the stairs. He built the screen himself. It was the second cinema he had built, after an earlier one in Hamilton.

  8. What it left him with

    Two things came out of this house and into the work Clinton does for other people. The lighting layout was his own design, down to the stair lighting in the cinema, and it worked well enough that it shaped how he has planned lighting since. So did the acoustic strategy — the Hebel floor system and the wall soundproofing both performed in use. Neither is something you can assess from a photograph on handover day; you find out by living in it.

Project details
The street elevation at dusk — the white weatherboard house on its corner site, the red front door and the garage lit from above under a deep blue sky.

0119 — showing photograph 1 of 19

Foxham — project photographs. The fan control changes which photograph is shown large.

Clinton, from Topp Shelf Building, has worked for us for a number of years. He was reliable and practical from start to finish, communicated well throughout, and his work speaks for itself. Happy to recommend him to anyone.

Mike RussellChurton Park, Wellington

FAQ

Questions
Before you enquire

Answers to the most common questions we get before a project begins. The full set — pricing, timelines, changes, consent and more — lives on the common questions page.

  • Start with the idea, however rough. Clinton doesn't mind how crazy it sounds. Then a rough budget and a timeframe, even if they're loose. Photos, a sketch or plans can help explain it, but you don't need every answer before you talk to us.

    In the first conversation, he'll answer what he can on the spot, and check anything that needs checking and get back to you. If it takes more than one conversation to get it right, it takes more than one. Plans are easy to change before the tools are out.

    Book a callback

    Read the guide: Who's actually running your building company?

    Read the guide: Working out what you actually want

  • It depends on the work and the site. Some work needs consent and some is exempt, so we'd rather look at your actual job than hand you a generic rule. If you're not sure where your job sits, ask the council before you start.

    Where consent is needed, agree at the start who will handle the application and the council process. The code compliance certificate at the end of a consented job is a separate step, and on a job Clinton runs from start to finish, he takes care of it with your authority.

    View our building services

    Read the guide: Licensed, Master, Certified: what the badges actually mean

  • Before the work that depends on them. A window or paint colour nobody has picked can hold a job up. We work through those choices and put them on paper ahead of time.

    Some choices are easier on site. On a new build, we walk the site while the design is still being worked through, the best time for bigger changes. We walk through again once the framing's up, around when the windows are usually measured for manufacture. Before the plumbing and wiring go into the walls, there's another walkthrough to settle where the power points and lights go, and where the plumbing fittings sit.

    Outside, site levels, drainage and access need deciding early, as they can affect the design and consent. The finer decisions, like landscaping, paths and the final look of the driveway, are often easier once the house is standing.

    Talk your choices through

    Read the guide: Working out what you actually want

  • It depends on the work, the site and any consent it needs. When we quote, we talk through how long the work can realistically take, not the best case. Weather can hold things up, as can digging the site out.

    On staying with it: we run one main project at a time, so once yours starts, it's our main job. If something holds it up, Clinton looks at what else on the job can go ahead in the meantime, and when a delay affects your job, you'll hear it from him.

    Read the guide: When the plan changes